FREQUENTLY ASKED QUESTIONS

Warranty Information

Need Service?
LINK Pools & Landscape includes an extensive, hassle-free warranty on every pool and landscape we install. We stand behind our work 100 percent.
Please refer to your pool and landscape contract for specific information on warranty coverage.

Request warranty

Do you offer financing?
Yes,
We work with several banks which offer finance options for all backyard projects. As you might expect, rates and terms are dependent on your credit score and the type of financing you choose. We are happy to put you in contact with a representative who can answer more questions for you.
How are pools priced?
Pool pricing is typically based on a price for a standard sized pool. Pricing can also be affected by the many different design features, materials and equipment installed.
How do we pay for our pool project?
A down payment should never be more than 15% with any pool company in Arizona. We generally require a 10% down payment to begin the process. The pool building payment schedule has been set up and mandated through statutes in the state of Arizona. The payment schedule is in stages and consists of a 10%-25%-25%-25%-15%. The final 15% is due once the pool has passed final inspection and is ready for its interior finish.
When does the city inspect my pool?
The first inspection occurs after electric and before shotcrete. The city inspector ensures that all electrical connections and work are proper. They also review the pool’s structural engineering and steelwork. They do not inspect the shape of the pool, pool depth, or in most cases, pool plumbing, as these are not safety or code issues. They will check the pool’s location to ensure it is out of all setbacks and easements.
How long will my pool take to build?
The average pool project will take just under six to eight weeks of actual construction time to build. Specialized products and/or material availability could possibly increase construction time. The construction time for pools will vary depending on what features you want to include.

For example, a $30,000 Pool Project Only will typically take six weeks to complete. If you add a spa to your project it will typically take eight weeks to complete. If you plan to do a complete project, including pool/fire features/structures/landscape, you will typically be looking at three months of construction.

GET THE INSIDE SCOOP ON WHAT’S COMING UP!

Bonded & Insured | AZROC#’s: 315175, 317581

© Pool Link LLC - All rights reserved