The first inspection occurs after electric and before shotcrete. The city inspector ensures that all electrical connections and work are proper. They also review the pool’s structural engineering and steelwork. They do not inspect the shape of the pool, pool depth, or in most cases, pool plumbing, as these are not safety or code issues. They will check the pool’s location to ensure it is out of all setbacks and easements.